Client: Shropshire CC
Value: £270k
Date: Nov 15 – Feb 16
Duration: 13 Weeks

Shropshire CC Resurfacing Program – 2016 Tender F – B4360 Welshampton
To side out the road, deep plane and excavate the road for strengthening. Drainage works with gullies and new outfall into existing watercourse and badger sett relocation, newt protection and spillways to pond.
Reinforced edge strengthening concrete slab with 1500m of kerbing and reinforced haunching / strengthening. Access roads and realignment of the main carriageway levels including tree pruning. Farm access concrete carriageway construction to prevent steep embankments from falling away.


• Storm drainage, Gullies & Manholes
• V Ditch works and headwall construction
• Road edge strengthening slab construction & behind kerb fibre block reinforcement
• Kerbing & Edging
• Subbase, Base, regulating Binder & Wearing Course to Roads
• Road marking and cats eyes
• Access roads in concrete
• Tree pruning
• Siding out & Landscaping