Client: J Tomlinson
Value: £1 million
Date: Nov 16 – Aug 17
Duration: 44 Weeks
Client: J Tomlinson
Value: £1 million
Date: Nov 16 – Aug 17
Duration: 44 Weeks
J Tomlinson’s were commissioned to design and build a new sports pavilion to service the newly built Kingsmere village in Bicester. Works were undertaken on a green field site; works commenced in early November 2016 with top soil strip and are due to complete in August.
Working with J Tomlinson’s we helped to develop their design with both value engineering and various design inputs. Areas include the Sports Pavilion, Main Car Park and Service Yard. An existing watercourse ditch dissects the site down the centre and meticulous environmental controls implemented to prevent pollution or affecting local wildlife and aquatic habitat.
• Storm drainage, Gullies & Manholes, 3 No Welded Attenuation Tanks, 2 No Oil Separators
• Foul drainage for the site including Thames water connection
• Installation of highway grade culvert units, training walls and scour slabs
• Foundations and floor slab for the building
• Kerbing & Edging
• Capping & Subbase
• Top soil strip, cut & fill operation
• Construction of permeable overflow car park
• Lighting, Comms and CCTV Ducting and all incoming service trenches & connections
• S38 Highways work for 2 entrances
• Hard landscaping to footpaths and social areas
Talk to us today to see how we can help you with your project.
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.