Client: J Tomlinson
Value: £1 million
Date: Nov 16 – Aug 17
Duration: 44 Weeks

Kingsmere Sports Pavilion Bicester, Oxfordshire
J Tomlinson’s were commissioned to design and build a new sports pavilion to service the newly built Kingsmere village in Bicester. Works were undertaken on a green field site; works commenced in early November 2016 with top soil strip and are due to complete in August.
Working with J Tomlinson’s we helped to develop their design with both value engineering and various design inputs. Areas include the Sports Pavilion, Main Car Park and Service Yard. An existing watercourse ditch dissects the site down the centre and meticulous environmental controls implemented to prevent pollution or affecting local wildlife and aquatic habitat.


• Storm drainage, Gullies & Manholes, 3 No Welded Attenuation Tanks, 2 No Oil Separators
• Foul drainage for the site including Thames water connection
• Installation of highway grade culvert units, training walls and scour slabs
• Foundations and floor slab for the building
• Kerbing & Edging
• Capping & Subbase
• Top soil strip, cut & fill operation
• Construction of permeable overflow car park
• Lighting, Comms and CCTV Ducting and all incoming service trenches & connections
• S38 Highways work for 2 entrances
• Hard landscaping to footpaths and social areas